{"id":4250,"date":"2026-10-30T15:19:41","date_gmt":"2026-10-30T14:19:41","guid":{"rendered":"https:\/\/aivp-rufenacht-prize.org\/?post_type=projets&#038;p=4250"},"modified":"2026-10-30T23:07:17","modified_gmt":"2026-10-30T22:07:17","slug":"the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2","status":"publish","type":"projets","link":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/","title":{"rendered":"The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city"},"content":{"rendered":"\n<h1 class=\"wp-block-heading\">To sum up<\/h1>\n\n\n\n<p>The Port of the Balearic Islands\u2019 New Paseo Mar\u00edtimo project addresses a common port-city planning challenge: a heavily car-dominated waterfront road that creates a barrier between the port and the city, leaving little space for pedestrians, cyclists or leisure activities. A situation typical of many port cities, it has been transformed through a major redesign that significantly improves the quality of the urban environment.<\/p>\n\n\n\n<p>The project reconnects citizens with the waterfront as a destination. It features an urban boulevard, multi-use spaces, a landscape scheme rich in greenery, and carefully designed lighting that enhances aesthetics, comfort and functionality, while prioritizing active mobility. The project also addresses wider environmental challenges through a completely new sewage system and a comprehensive planting scheme that improves climate comfort and promotes biodiversity. Traffic has been reduced by almost half, while connections across the waterfront have been improved. The result is a network of high-quality public spaces offering safe and comfortable areas for pedestrians, cyclists, families and leisure activities. A newly opened Port Center further strengthens this transformation by helping citizens better understand and connect with port activities.<\/p>\n\n\n\n<p><strong>Design by:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Basic design and the detailed design were prepared by the JAMLET\u2013TYPSA joint venture, winner of the international public tender launched by the APB in 2018.<\/li>\n\n\n\n<li>Architecture and urban and landscape design: Jos\u00e9 Antonio Mart\u00ednez Lape\u00f1a and El\u00edas Torres &#8211; Jos\u00e9 Antonio Mart\u00ednez Lape\u00f1a &amp; El\u00edas Torres Architects (JAMLET).<\/li>\n\n\n\n<li>Engineering and technical development: TYPSA (T\u00e9cnica y Proyectos, S.A.).<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"625\" src=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/Pages-de-Paseo-Maritimo-Palma_AIVPPrizeAntoineRufenacht_2026_Location-Master-Plan_2-1024x625.jpg\" alt=\"\" class=\"wp-image-4214\" srcset=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/Pages-de-Paseo-Maritimo-Palma_AIVPPrizeAntoineRufenacht_2026_Location-Master-Plan_2-1024x625.jpg 1024w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/Pages-de-Paseo-Maritimo-Palma_AIVPPrizeAntoineRufenacht_2026_Location-Master-Plan_2-300x183.jpg 300w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/Pages-de-Paseo-Maritimo-Palma_AIVPPrizeAntoineRufenacht_2026_Location-Master-Plan_2-768x469.jpg 768w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/Pages-de-Paseo-Maritimo-Palma_AIVPPrizeAntoineRufenacht_2026_Location-Master-Plan_2-1536x937.jpg 1536w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/Pages-de-Paseo-Maritimo-Palma_AIVPPrizeAntoineRufenacht_2026_Location-Master-Plan_2-2048x1250.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h1 class=\"wp-block-heading\">Outstanding features:<\/h1>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Transformation of 169,010 m\u00b2<\/strong> of port areas into an accessible, vibrant and shared waterfront.<\/li>\n\n\n\n<li><strong>Conversion of a road primarily dedicated to motor vehicle traffic into a public space<\/strong> promoting sustainable transport and recreational uses.<\/li>\n\n\n\n<li>Creation of 37,351 m\u00b2 of <strong>green and permeable surfaces<\/strong>.<\/li>\n\n\n\n<li><strong>Modernisation of the sewerage networks<\/strong> and separation of rainwater and wastewater to minimise the risks of overflow and pollution.<\/li>\n\n\n\n<li>Establishment of a joint <strong>monitoring committee<\/strong> and a mechanism for dialogue with stakeholders;<\/li>\n\n\n\n<li>A <strong>participatory approach<\/strong> involving residents, local businesses, organisations, and experts in the design and implementation of the project.<\/li>\n\n\n\n<li><strong>Reuse of 95 per cent of materials<\/strong> from the demolition, thereby avoiding the import of 90,000 tonnes of materials onto the island.<\/li>\n<\/ul>\n\n\n\n<h1 class=\"wp-block-heading\">Why was it selected as a finalist ?<\/h1>\n\n\n\n<p>The New Paseo Mar\u00edtimo project demonstrates how a port authority can proactively transform the urban-port interface by shifting the balance of land use in favor of people. The project also stands out for its governance approach. The design process involved extensive engagement with local businesses and communities. The Port Authority delivered the improvements on port-owned land before transferring the redeveloped areas to the city for maintenance, establishing a practical framework for long-term cooperation.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\">Images of the project<\/h1>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"4235\" src=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter6-1024x683.jpg\" alt=\"\" class=\"wp-image-4235\" srcset=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter6-1024x683.jpg 1024w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter6-300x200.jpg 300w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter6-768x512.jpg 768w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter6-1536x1024.jpg 1536w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter6-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"4229\" src=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter5-1024x683.jpg\" alt=\"\" class=\"wp-image-4229\" srcset=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter5-1024x683.jpg 1024w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter5-300x200.jpg 300w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter5-768x512.jpg 768w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter5-1536x1024.jpg 1536w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter5-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"4226\" src=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter4-1024x683.jpg\" alt=\"\" class=\"wp-image-4226\" srcset=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter4-1024x683.jpg 1024w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter4-300x200.jpg 300w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter4-768x512.jpg 768w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter4-1536x1024.jpg 1536w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter4-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"4223\" src=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter3-1024x683.jpg\" alt=\"\" class=\"wp-image-4223\" srcset=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter3-1024x683.jpg 1024w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter3-300x200.jpg 300w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter3-768x512.jpg 768w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter3-1536x1024.jpg 1536w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter3-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"4217\" src=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter2-1024x683.jpg\" alt=\"\" class=\"wp-image-4217\" srcset=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter2-1024x683.jpg 1024w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter2-300x200.jpg 300w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter2-768x512.jpg 768w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter2-1536x1024.jpg 1536w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR2026_10_Baleares_PictureAfter2-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n\n\n<h1 class=\"wp-block-heading\">About the Port Authority of the Balearic Islands<\/h1>\n\n\n\n<div class=\"wp-block-media-text is-stacked-on-mobile\" style=\"grid-template-columns:31% auto\"><figure class=\"wp-block-media-text__media\"><img loading=\"lazy\" decoding=\"async\" width=\"554\" height=\"554\" src=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/logoPortsBaleare.png\" alt=\"\" class=\"wp-image-4240 size-full\" srcset=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/logoPortsBaleare.png 554w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/logoPortsBaleare-300x300.png 300w, https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/logoPortsBaleare-150x150.png 150w\" sizes=\"auto, (max-width: 554px) 100vw, 554px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p>The APB is the public authority managing the Balearic Islands&#8217; five State-owned ports of general interest \u2014 Palma, Alc\u00fadia, Ma\u00f3, Eivissa, and La Savina \u2014 on four islands. Under a landlord port model, these captive island ports receive most of the goods supplying the archipelago and sustain its connectivity. In 2025, they handled 17.5 million metric tonnes and 9.9 million passengers, nearly 25% of passenger traffic in the Spanish port system. As they occupy urban waterfronts, reconciling working ports with port\u2013city integration takes priority: in 2025 this integration accounted for 66.3% of the APB&#8217;s material and infrastructure investment (almost \u20ac25 million).<\/p>\n<\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Port of the Balearic Islands\u2019 New Paseo Mar\u00edtimo project addresses a common port-city planning challenge [&#8230;]<\/p>\n","protected":false},"featured_media":4244,"parent":0,"menu_order":20,"template":"","rubrique":[47],"annee":[57],"class_list":["post-4250","projets","type-projets","status-publish","has-post-thumbnail","hentry","rubrique-rubrique-2-gb","annee-2026-edition-applicants"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.8 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city - Aivp Rufenacht prize<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city - Aivp Rufenacht prize\" \/>\n<meta property=\"og:description\" content=\"The Port of the Balearic Islands\u2019 New Paseo Mar\u00edtimo project addresses a common port-city planning challenge [...]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/\" \/>\n<meta property=\"og:site_name\" content=\"Aivp Rufenacht prize\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-30T22:07:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR-siteweb-300x200px-29.png\" \/>\n\t<meta property=\"og:image:width\" content=\"300\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/\",\"url\":\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/\",\"name\":\"The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city - Aivp Rufenacht prize\",\"isPartOf\":{\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR-siteweb-300x200px-29.png\",\"datePublished\":\"2026-10-30T14:19:41+00:00\",\"dateModified\":\"2026-10-30T22:07:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#primaryimage\",\"url\":\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR-siteweb-300x200px-29.png\",\"contentUrl\":\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR-siteweb-300x200px-29.png\",\"width\":300,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/aivp-rufenacht-prize.org\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projets\",\"item\":\"https:\/\/aivp-rufenacht-prize.org\/projets\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"2026 Edition\",\"item\":\"https:\/\/aivp-rufenacht-prize.org\/en\/annee\/2026-edition-applicants\/\"},{\"@type\":\"ListItem\",\"position\":4,\"name\":\"The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/#website\",\"url\":\"https:\/\/aivp-rufenacht-prize.org\/\",\"name\":\"Aivp Rufenacht prize\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/aivp-rufenacht-prize.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/#organization\",\"name\":\"Aivp Antoine Rufenacht\",\"url\":\"https:\/\/aivp-rufenacht-prize.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2023\/11\/logo-prix-antoine-rufenachte.svg\",\"contentUrl\":\"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2023\/11\/logo-prix-antoine-rufenachte.svg\",\"width\":1,\"height\":1,\"caption\":\"Aivp Antoine Rufenacht\"},\"image\":{\"@id\":\"https:\/\/aivp-rufenacht-prize.org\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city - Aivp Rufenacht prize","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/","og_locale":"en_US","og_type":"article","og_title":"The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city - Aivp Rufenacht prize","og_description":"The Port of the Balearic Islands\u2019 New Paseo Mar\u00edtimo project addresses a common port-city planning challenge [...]","og_url":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/","og_site_name":"Aivp Rufenacht prize","article_modified_time":"2026-10-30T22:07:17+00:00","og_image":[{"width":300,"height":200,"url":"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR-siteweb-300x200px-29.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/","url":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/","name":"The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city - Aivp Rufenacht prize","isPartOf":{"@id":"https:\/\/aivp-rufenacht-prize.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#primaryimage"},"image":{"@id":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#primaryimage"},"thumbnailUrl":"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR-siteweb-300x200px-29.png","datePublished":"2026-10-30T14:19:41+00:00","dateModified":"2026-10-30T22:07:17+00:00","breadcrumb":{"@id":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#primaryimage","url":"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR-siteweb-300x200px-29.png","contentUrl":"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2026\/10\/PAR-siteweb-300x200px-29.png","width":300,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/aivp-rufenacht-prize.org\/en\/projets\/the-new-paseo-maritimo-of-palma-from-traffic-corridor-to-a-waterfront-shared-by-a-working-port-and-its-city-2\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/aivp-rufenacht-prize.org\/en\/"},{"@type":"ListItem","position":2,"name":"Projets","item":"https:\/\/aivp-rufenacht-prize.org\/projets\/"},{"@type":"ListItem","position":3,"name":"2026 Edition","item":"https:\/\/aivp-rufenacht-prize.org\/en\/annee\/2026-edition-applicants\/"},{"@type":"ListItem","position":4,"name":"The New Paseo Mar\u00edtimo of Palma: from traffic corridor to a waterfront shared by a working port and its city"}]},{"@type":"WebSite","@id":"https:\/\/aivp-rufenacht-prize.org\/#website","url":"https:\/\/aivp-rufenacht-prize.org\/","name":"Aivp Rufenacht prize","description":"","publisher":{"@id":"https:\/\/aivp-rufenacht-prize.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/aivp-rufenacht-prize.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/aivp-rufenacht-prize.org\/#organization","name":"Aivp Antoine Rufenacht","url":"https:\/\/aivp-rufenacht-prize.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/aivp-rufenacht-prize.org\/#\/schema\/logo\/image\/","url":"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2023\/11\/logo-prix-antoine-rufenachte.svg","contentUrl":"https:\/\/aivp-rufenacht-prize.org\/wp-content\/uploads\/2023\/11\/logo-prix-antoine-rufenachte.svg","width":1,"height":1,"caption":"Aivp Antoine Rufenacht"},"image":{"@id":"https:\/\/aivp-rufenacht-prize.org\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/aivp-rufenacht-prize.org\/en\/wp-json\/wp\/v2\/projets\/4250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aivp-rufenacht-prize.org\/en\/wp-json\/wp\/v2\/projets"}],"about":[{"href":"https:\/\/aivp-rufenacht-prize.org\/en\/wp-json\/wp\/v2\/types\/projets"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aivp-rufenacht-prize.org\/en\/wp-json\/wp\/v2\/media\/4244"}],"wp:attachment":[{"href":"https:\/\/aivp-rufenacht-prize.org\/en\/wp-json\/wp\/v2\/media?parent=4250"}],"wp:term":[{"taxonomy":"rubrique","embeddable":true,"href":"https:\/\/aivp-rufenacht-prize.org\/en\/wp-json\/wp\/v2\/rubrique?post=4250"},{"taxonomy":"annee","embeddable":true,"href":"https:\/\/aivp-rufenacht-prize.org\/en\/wp-json\/wp\/v2\/annee?post=4250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}